Overall – moving forward, getting things done every day. Electricians and plumbers are getting their systems roughed-in. Windows ordered in late April have started arriving along with entry doors. Should be able to secure both buildings in another week or 2.

Monday – installing foam board in preparation for window installation later in the week.

Tuesday – visit from a siding contractor today who will be working up a quote. Pella arrived and unloaded entry doors for both buildings and most of the windows for the house.

Wednesday – visits by drywall and siding contractors today to get quotes. Started installing windows and foam board on the shop.

Thursday – Mike B. and I worked on the red truck today, while Kyle continued to install foam board on the shop. I purchased a diagnostic guide to help me isolate the root cause of the – engine cranks, but will not start – problem. No celebration today – still don’t know what is wrong with it.

Friday – Installed 3 out of 4 entry doors. The last door is a quality escape and is mis-manufactured. It is so goofy, we can’t see how anyone let it go to shipping to be boxed up for delivery.

Saturday – spent part of the day getting caught up with logging receipts and updating the excel file I use to keep everything organized. Made a list of material needed for Monday, and will be at Menards when the doors open on Sunday.

Sunday – even with a lack of customers so early on a Sunday, it still took a nearly three hours hours to get everything on the list of material in the store, and… culling through the crooked boards to find straight lumber out in the lumber yard. Spent another hour at the site unloading the lumber and the other stuff. Spent some time while I was at the site to locate additional electrical boxes for receptacles and light switches.