Overall: Moving forward, although short days and cold temperatures mean fewer productive hours each day. Exterior siding was delivered, and the front porch ceiling was completed. Completed central vacuum pipes and fittings for both structures. Still pulling wires for shop equipment.

Monday: Pulling wire and installing central vacuum pipe and fittings.

Tuesday: Same as Monday.

Wednesday: Spent time measuring the kitchen, pantry, laundry room and great room north wall to create drawings for the purpose of developing detailed cabinet requirements. After that… back to pulling wire and working on central vacuum plumbing.

Thursday: Got Kyle back today, so worked on front porch ceiling. First exterior finish effort.

Friday: Continued effort on front porch ceiling. Must be completed (same as breezeway ceiling) before we can apply exterior siding.

Saturday: Completed front porch ceiling.

Sunday: Completed central vacuum pipe and fittings.